Mumbai
Mumbai Metro Line 7 is a 16.5 km elevated corridor on the Western Express Highway, built for MMRDA, where J. Kumar Infraprojects Ltd. designed and constructed the viaduct and elevated stations across its central reach.
Mumbai Metro Line 7 runs 16.5 km along the Western Express Highway, connecting Dahisar in the north to Andheri in the east. The fully elevated corridor carries 13 stations and forms part of the Red Line. The line opened in two phases, with the Dahisar to Aarey section from April 2022 and the Aarey to Andheri section from January 2023.





